Work on hold for Cook Road Bridge

Work is temporarily on hold on a bridge damaged in the last round of major flooding.

Posted: Feb 22, 2018 7:03 PM

VIGO COUNTY, Ind. (WTHI) - Work is temporarily on hold on a bridge damaged in the last round of major flooding.

News 10 talked to the Vigo County Engineering Department about the Cook Road Bridge in western Vigo County.

The contractor is about 40 percent complete on foundation work required to install the bridge.

But, the recent rain has flooded the work zone.

Crews are checking out the situation day-by-day to determine when work can start again.

Article Comments

Terre Haute
Scattered Clouds
87° wxIcon
Hi: 90° Lo: 70°
Feels Like: 93°
Robinson
Scattered Clouds
87° wxIcon
Hi: 89° Lo: 69°
Feels Like: 97°
Indianapolis
Broken Clouds
88° wxIcon
Hi: 89° Lo: 72°
Feels Like: 94°
Rockville
Scattered Clouds
87° wxIcon
Hi: 87° Lo: 69°
Feels Like: 93°
Casey
Few Clouds
86° wxIcon
Hi: 89° Lo: 70°
Feels Like: 92°
Brazil
Scattered Clouds
87° wxIcon
Hi: 89° Lo: 70°
Feels Like: 93°
Marshall
Scattered Clouds
87° wxIcon
Hi: 89° Lo: 69°
Feels Like: 93°
Steamy and Stormy.
WTHI Planner
WTHI Temps
WTHI Radar

WTHI Events